Shed Pad, Deck Footing & Small Foundation Equipment Rental
A shed lasts longer on a level gravel pad, and a deck is only as solid as its footings. C&W Equipment Rentals rents the mini skid steers and mini excavator that get the groundwork done in a day, across Metro Detroit.
Which machine for which job
| Job | Best machine | Why |
|---|---|---|
| Gravel pad for a shed, playset or hot tub | AGT YSRT14 or Ditch Witch SK800 with bucket | Strips sod, levels, and spreads gravel |
| Deck and porch footings | CFG H13R mini excavator | Digs clean holes to frost depth |
| Garage or addition footings | CFG H13R mini excavator | Trenches footings and frost walls |
| Bringing in gravel, hauling sod and soil | PJ 7x14 dump trailer | Several yards per trip |
How to build a gravel shed pad
- Call MISS DIG 811 at least 3 business days ahead, and check your city's setback rules for sheds.
- Mark the pad about 1 to 2 feet larger than the shed on every side.
- Strip sod and dig down 4 to 6 inches with the skid steer bucket.
- Add landscape fabric and a timber or block border.
- Spread gravel in layers, compacting each one, until the pad is level.
Deck and porch footings in Michigan
In Southeast Michigan, deck and porch footings typically need to reach at least 42 inches deep so frost doesn't heave them. A mini excavator digs a footing hole in a few minutes and handles clay that would stop a hand digger cold. Most cities require a permit and footing inspection for decks, so check before you dig.
Delivery, hours and service area
Free delivery and pickup within 10 miles, then $5 per mile. We serve all of Metro Detroit, including Oakland, Wayne and Macomb counties, plus Ann Arbor, Brighton and Howell. Open 7am to 7pm Monday to Saturday, 7am to 2pm Sunday.
Book online or call (248) 303-8515.
Shed pad and footing FAQ
What equipment do I need to build a shed pad?
A mini skid steer to strip sod, level the ground and spread gravel, plus a plate compactor. A dump trailer helps bring in gravel.
How deep do deck footings need to be in Michigan?
Deck footings in Southeast Michigan typically need to be at least 42 inches deep to stay below the frost line. Check your local code.
Can a mini excavator dig footings?
Yes. It digs deck, porch and garage footings quickly, even in heavy clay.
Book the equipment for this job
AGT YSRT14 mini skid steer · Ditch Witch SK800 mini skid steer · CFG H13R mini excavator · PJ 7x14 dump trailer · Full inventory